Thomas Jefferson Papers

Notes on Washington Highways, 2 July 1804

Notes on Washington Highways

[ca. 2 July 1804]

Washington. Highways.

<a bridge over the Tyber>

2. arches of 10. f. each adjg Tyber bridge

bed of creek enlarged & B street canalled1

1.  1. 3. f. Culvert. 30. f. + 2. of 5. f. each. 50 f.
betw. Tyber & Duane’s
2. 1. do. at Duane’s
3. 1. do. opposite Market bridge
4. 1. 4. f. do. opposite the hotel
5. the culvert at the brew house to be arched with brick
6. 1. 6. f. culvert opposite the theatre
7. a 3. f. do. near to Rhodes’s.
  The sides of the above to be drystone well
the back <covered> faced with mortar
 
the top covered with long stones except Nos. 5. & 6. to be arched with brick
gravel repaired.

mr Latrobe estimates a 3. f. culvert of brick. 120. f. = 300 D

  but of stone it would be  120. f. for 150. D.
and of course 50 f for 62.50
4. 3. f. culverts then will cost    250. D
1. 4. f. do.     83.
2. 6. f. do. with brick arches 150.    300
2. arches over Tyber ½ of 1300.    650.
gravelling    667.
  1950
<roads at Culverts & contingencies> <420>
<2900>

existing materials & work will cover omissions & contingencies.

MS (DLC: Madison Papers, Miscellaneous Manuscripts); entirely in TJ’s hand, with alterations to several figures; undated, but see TJ to Thomas Munroe, 2 July; on same sheet as Notes on Shipment, [before 23 July 1804], and Paragraph on Disaffected Citizens, [1804?], interleaved in a bound volume of Madison’s notes (see Madison, Papers description begins William T. Hutchinson, Robert A. Rutland, J. C. A. Stagg, and others, eds., The Papers of James Madison, Chicago and Charlottesville, 1962- , 41 vols.; Sec. of State Ser., 1986- , 11 vols.; Pres. Ser., 1984- , 10 vols.; Ret. Ser., 2009- , 3 vols. description ends , 14:168n).

1Line interlined.

Index Entries